A gentle ride for everyone
Starts and stops are soft, which children, older family members and anyone unsteady on their feet will notice.
A hydraulic lift starts and stops softly, fits in a small space and needs no overhead machine room. It suits homes and buildings up to G+4 (five stops).
Starts and stops are soft, which children, older family members and anyone unsteady on their feet will notice.
Our design office draws every part of your lift after measuring your site, so the cabin, doors and drive match your building and your choice of finish.
We design every lift at HLA. Some parts are made in our own workshop and some by specialist partners, and we fit established brands. You have one team to call from survey to service.
For villas, duplexes and independent houses, sized to your shaft so you give up as little floor space as possible.
Glass, octagon and panelled cabins in many finishes, so the lift becomes part of your interior.
For apartments and commercial buildings, in machine-room-less (MRL), traction and belt-drive types, chosen for the number of floors and the daily traffic.
Hydraulic goods lifts for shops, godowns and workshops, built for heavy daily loads and easy to service.
A chair that runs on a track along your staircase, so anyone who finds stairs difficult can reach every floor safely.
Lifts that give wheelchair users and people with limited mobility step-free access to every floor.
German valve technology The valve decides how a hydraulic lift starts, runs and stops. We fit Blain valves on most of our hydraulic lifts. Blain designs and makes them in Heilbronn, Germany, with over fifty years of hydraulic lift experience.

Handover usually takes 60–75 days from order confirmation, depending on how ready your site is. If you need it sooner, ask us about an express schedule, which has taken 15–20 days.
We measure your shaft and ask how you will use the lift, then tell you what fits.
Site surveyYou receive the drawing, the finish options and a written quote, and you decide once you have seen them.
Design and quoteWe tell you by when each decision, such as cabin finish or door type, needs to be made so your handover date holds.
PlanningWe keep you informed at every stage. If you change something, you see the extra cost and days in writing before we begin.
InstallationWe test the lift while you watch, note any touch-ups on a written list, and give you a handover pack. Afterwards you can add an annual maintenance contract.
HandoverMake three choices and the tool writes a message for you to send us. Our team replies with the next step, which is usually a site visit.
Here are some recent installations.
We have installed a customised hydraulic lift from HLA Lifts almost 2 years back. The lift is working very smoothly. The power consumption is very low. Their after sales service is prompt.
Great experience with HLA team during installation of two lifts in our Apartment customized to our needs. Very much satisfied with the Quality, Commitment and Professionalism with which their team executed both the projects.
Hydraulics Lifts have made a capsule hydraulic lift at my home. It is very nice for my parents and old people who can’t actually climb stairs. They are reliable, and solution finders for any sort of issue regarding the lift.
Regular servicing keeps a lift safe and reliable. You can choose planned maintenance visits, and you can call us when something goes wrong.
Our sizing tool gives you an indicative shaft size and a plan to start your drawing. Send us your details and our design team will review your layout and confirm the sizes.
HLA began in 1990 as a hydraulic spares business. Today we supply hoses and power packs, and build flushing and pressure-test systems for plants and workshops.
We supply home lifts, passenger lifts for apartments and commercial buildings (MRL, traction and belt drive), cargo lifts, accessibility lifts and stairlifts, in a range of finishes.
Handover usually takes 60–75 days from order confirmation, depending on how ready your site is. Express projects have been handed over in 15–20 days. We confirm your schedule after the site survey.
The cost depends on the number of floors, the shaft, the cabin finish and the doors. The Design your lift tool gives you a starting range, and the site survey leads to a firm written quote.
It needs a shaft or an opening where we can build one, a pit, and a small space for the power unit. We survey the site, measure it and explain what fits before you decide.
A hydraulic lift suits homes and buildings up to G+4 (five stops). A traction, MRL or belt-drive lift suits taller buildings with more daily use. We recommend the right type after seeing your building.
The lift returns to the nearest floor so you can step out. The power unit also has a manual release knob that can bring the car down in an emergency, and a GSM-based intercom is standard in our lifts, so nobody is left stranded, even without a phone.
A stairlift is a chair that travels along a track fixed to your staircase. It helps anyone who finds climbing stairs difficult. A stairlift is separate from a passenger or home lift, which has its own shaft.
Yes. Hydraulic lifts have a 3-year warranty from the day of handover. Passenger lifts (MRL, traction and belt drive), cargo lifts, accessibility lifts and stairlifts have a 1-year warranty. If a part fails because of a manufacturing defect or poor workmanship, we repair or replace it. The warranty does not cover wear and tear, misuse, accidents or water damage. Every lift also comes with 12 months of free planned maintenance after handover.
We do. We aim to respond to breakdown calls within 1–2 working days in and around Visakhapatnam and 3–4 working days outstation, and we offer annual maintenance contracts.
Yes. HLA began in 1990 as a hydraulic spares business and today supplies hoses and power packs and builds flushing and pressure-test systems for industry.
Tell us about your building. We will visit, measure and give you a written plan.